By Miles Nicholson
Here’s how you can do it!
Right click over the current activated project in the Project Manager
Select Properties > Cross Reference tab.

In the above example, the normal cross reference formula is “%S/%N”. On the Between Drawings add “ (%D)” onto the end of the normal method.
Select
to accept any changes
Right click over each drawing in the project > Properties > Drawing Properties
Add the client drawing value into the Drawing field.

Select
to accept any changes.
Repeat on all other drawings
Highlight all drawings in the project > right click and select Apply Project Defaults
How to Update
1)Title Block Update
a) Right click over the project > Title Block Update
b) Ensure the R Drawing (%D value) is selected
Run on the entire project
2)Cross Reference Update
a) Select Schematic ribbon tab > Edit Components panel >
Component Cross-Reference
Run on the entire project
3. Update Signal reference
a) Select Schematic ribbon tab > Edit Wires/Wire Numbers panel
> Update Signal References
Run on the entire project
The drawings will then be similar to: